CFN SeriesSite Controller III Start-upManualMDE-4793AFor CFN III Versions 3.5 and above

Strany 2 - Trademarks

Starting a Site Controller III System Start-up OverviewPage 4 MDE-4793A CFN Series Site Controller III Start-up Manua

Strany 3 - Table of Contents

Start-up Commands Optional FeaturesPage 94 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versio

Strany 4 - 7 – System Power 53

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 95Reset Transaction File Start-up Com

Strany 5 - 13 – Start-up Commands 79

Start-up Commands Diagnostics and HistoryPage 96 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III

Strany 6 - 15 – Finish Start-up 105

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 97Verification and Backup Start-up Co

Strany 7 - Related Documents

Start-up Commands Release, Applications, and System DataPage 98 MDE-4793A CFN Series Site Controller III Start-up Manu

Strany 8 - Based on Site Configuration

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 99SC III/POS WS Setup Start-up Comman

Strany 9 - Abbreviations and Acronyms

Start-up Commands SC III/POS WS SetupPage 100 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Ver

Strany 10 - Required Tools

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 101Customer Training14 – Customer Tra

Strany 11 - Using This Manual

Customer TrainingPage 102 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above

Strany 12 - Warranty

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 103Customer Training Demonstrate how

Strany 13

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 5Filling Out the Start-up Form Starti

Strany 14 - In an Emergency

Customer TrainingPage 104 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above

Strany 15 - Hazards and Actions

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 105Finish Start-up15 – Finish Start-u

Strany 16 - Important Safety Information

Finish Start-upPage 106 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above ·

Strany 17 - 3 – Site Information

Sample FormMDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 107Gasboy Motor Fuel Mana

Strany 18 - Authorize Users

Gasboy Motor Fuel Management SystemPage 108 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · Nov

Strany 19 - Receipt Messages

Sample FormMDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 109Gasboy Motor Fuel Mana

Strany 20 - Load Product - Fuels

Gasboy Motor Fuel Management SystemPage 110 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · Nov

Strany 21 - Load Tank

Sample FormMDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 111Gasboy Motor Fuel Mana

Strany 22 - Load Fuel

Gasboy Motor Fuel Management SystemPage 112 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · Nov

Strany 23 - Load Cutoff

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 113Gasboy Motor Fuel Management Syst

Strany 24 - Lockout Type

Starting a Site Controller III System WarrantyPage 6 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN

Strany 25 - Load Remote Host Phone Number

Gasboy Motor Fuel Management SystemPage 114 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 20

Strany 26 - Load Merchandise Prods/Depts

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 115Gasboy Motor Fuel Management Syst

Strany 27 - Load Price Lookup

Gasboy Motor Fuel Management SystemPage 116 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 20

Strany 28 - Profit Point Product Layout

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 117Gasboy Motor Fuel Management Syst

Strany 29

Gasboy Motor Fuel Management SystemPage 118 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 20

Strany 30

IndexMDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Index-1Symbols;I Option 79AAlert symb

Strany 31

Index© 2008 Gasboy International Inc.7300 West Friendly Avenue · Post Office Box 22087Greensboro, North Carolina 27420Phone (336) 547-5000 · http://ww

Strany 32

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 7Important Safety Information2 – Impo

Strany 33 - Profit Point Default Keyboard

Important Safety InformationPage 8 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5

Strany 34

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 9Important Safety InformationHazards

Strany 35 - 4 – Begin Start-up Form

Important Safety InformationPage 10 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5

Strany 36

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 11Communication Port Settings Site In

Strany 37

If a 2-wire device is connected to a loop that is set for 4-wire communication, the SC will not operate correctly. 4-wire devices on a 2-wire loop may

Strany 38

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 13Receipt Messages Site InformationRe

Strany 39 - 5 – Physical System Layout

Computer Programs and DocumentationAll Gasboy computer programs (including software on diskettes and within memory chips) and documentation are copyri

Strany 40 - ICR Assembly

Site Information Broadcast MessagesPage 14 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versi

Strany 41

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 15Load Fuel Inventory Site Informatio

Strany 42 - Electronic Pumps

Site Information Load PricesPage 16 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5

Strany 43 - SC COMM CPU PCB

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 17Load Pumps Site InformationLoad Pum

Strany 44 - Switches, S1 and S2

Site Information Load TaxPage 18 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 an

Strany 45 - SC Memory I/O Board

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 19CRON Commands Site InformationCRON

Strany 46 - Switch S2

Site Information Load Merchandise Prods/DeptsPage 20 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN

Strany 47 - Pump Control EXPMUX CPU Board

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 21Load Merchandise Inventory Site Inf

Strany 48 - Figure 6-4: EXPMUX CPU Board

Site Information Profit Point Product LayoutPage 22 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN

Strany 49

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 23Profit Point Product Layout Site In

Strany 50

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page iTable of Contents1 – Starting a Sit

Strany 51 - Pump Control I/O PCB

Site Information Profit Point Product LayoutPage 24 MDE-4793A CFN Series Site Controller III Start

Strany 52

Profit Point Product Layout Site InformationMDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 200

Strany 53 - DIP Switches

Site Information Profit Point Product LayoutPage 26 MDE-4793A CFN Series Site Controller III Start

Strany 54 - CPU PCB Jumper Settings

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 27Profit Point Default Keyboard Site

Strany 55 - POS Distribution Box (D-Box)

Site Information Worksheet for Pump/CRIND Device - PC Interface (if used)Page 28 MDE-4793A CFN Series Site Controller

Strany 56 - Switch SW1

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 29Parts 1 through 6 Begin Start-up Fo

Strany 57 - Standalone Star Printer

Begin Start-up Form Parts 1 through 6Page 30 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Vers

Strany 58

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 31Parts 1 through 6 Begin Start-up Fo

Strany 59 - 7 – System Power

Begin Start-up Form Parts 1 through 6Page 32 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Vers

Strany 60 - System Power

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 33SC Physical System Layout5 – Physic

Strany 61 - Manual Override Test

Page ii MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 20085 – Physical System Layout 33SC.

Strany 62

Physical System Layout ICR AssemblyPage 34 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versio

Strany 63 - Turning On AC Power

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 35PPC or SC III/POS WS (Optional) Phy

Strany 64 - Configuring the PPC

Physical System Layout Tank Monitoring System (Optional)Page 36 MDE-4793A CFN Series Site Controller III Start-up Manu

Strany 65 - Set Up CONFIG.POS File

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 37SC COMM CPU PCB Jumpers and Switch

Strany 66 - Printer/Logger

Jumpers and Switch Settings SC COMM CPU PCBPage 38 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN II

Strany 67 - SC Configuration Changes

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 39SC Memory I/O Board Jumpers and Swi

Strany 68

Jumpers and Switch Settings SC Memory I/O BoardPage 40 MDE-4793A CFN Series Site Controller III Start-up Manual for CF

Strany 69 - +5 VDC Measurement

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 41PCU Jumpers and Switch SettingsPCUF

Strany 70

Jumpers and Switch Settings PCUPage 42 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3

Strany 71 - +5 VDC Adjustment

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 43PCU Jumpers and Switch Settings8 Pu

Strany 72 - +12 VDC Measurement

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page iiiOkidata® Printer/Logger . . . . .

Strany 73

Jumpers and Switch Settings PCUPage 44 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3

Strany 74

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 45PCU Jumpers and Switch SettingsPump

Strany 75 - 11 – Communication Tests

Jumpers and Switch Settings PCUPage 46 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3

Strany 76 - SC III or Remote Terminal

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 47ICR Jumpers and Switch SettingsICRD

Strany 77 - Tank Monitor (Serial Port)

Jumpers and Switch Settings ICRPage 48 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3

Strany 78

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 49RS-232/RS-485 Converter Jumpers and

Strany 79

Jumpers and Switch Settings FPRPage 50 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3

Strany 80 - Test (Optional)

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 51Pumps and Dispensers Jumpers and Sw

Strany 81 - Before Using Fuel Point

Jumpers and Switch Settings Standalone Star PrinterPage 52 MDE-4793A CFN Series Site Controller III Start-up Manual fo

Strany 82

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 53System Power7 – System PowerTo powe

Strany 83 - Reader Entries and Fuel Point

Page iv MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008Load Cron . . . . . . . . . . . .

Strany 84

System PowerPage 54 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November

Strany 85 - 13 – Start-up Commands

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 55Verify General Guidelines Pump/Disp

Strany 86 - Sign-on and Preliminary Steps

Pump/Dispenser Manual Test Manual Override TestPage 56 MDE-4793A CFN Series Site Controller III Start-up Manual for CF

Strany 87

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 57Turning On AC Power Component Power

Strany 88 - Security Key Management

Component Power-up and Configuration Configuring the PPCPage 58 MDE-4793A CFN Series Site Controller III Start-up Manu

Strany 89

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 59Configuring the PPC Component Power

Strany 90

Component Power-up and Configuration Okidata® Printer/LoggerPage 60 MDE-4793A CFN Series Site Controller III Start-up

Strany 91

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 61Remote Terminal Setup Component Pow

Strany 92

Component Power-up and Configuration Series 9800 Electronic Pumps and DispensersPage 62 MDE-4793A CFN Series Site Cont

Strany 93

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 63SC III DC Power Measurement and Adj

Strany 94 - Card Lockout

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 1Introduction Starting a Site Control

Strany 95 - Load Limitation

DC Power Measurement and Adjustment PCU(s)Page 64 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Ver

Strany 96 - Load Phone

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 65ICR DC Power Measurement and Adjust

Strany 97

DC Power Measurement and Adjustment FPRPage 66 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versio

Strany 98 - Enable Devices

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 67PPC DC Power Measurement and Adjust

Strany 99 - Cash Drawer, Shifts

DC Power Measurement and Adjustment Electronic PumpsPage 68 MDE-4793A CFN Series Site Controller III Start-up Manual for C

Strany 100 - Optional Features

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 69Communication Tests11 – Communicati

Strany 101 - Reset Transaction File

Communication Tests SC III or Remote TerminalPage 70 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN

Strany 102 - Diagnostics and History

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 71Tank Monitor (Serial Port) Communic

Strany 103 - Site Data

Communication Tests Tank Monitor (Serial Port)Page 72 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN

Strany 104 - Standalone Profit Point Setup

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 73ICR - Pump Activation Test (Optiona

Strany 105 - SC III/POS WS Setup

Starting a Site Controller III System Related DocumentsPage 2 MDE-4793A CFN Series Site Controller III Start-up Manua

Strany 106

Pump/Dispenser Automatic Test Profit Point or SC III/POS WS - Postpay Pump Activation Test (Optional)Page 74 MDE-4793A

Strany 107 - 14 – Customer Training

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 75Profit Point or SC III/POS WS - Pre

Strany 108 - Customer Training

Pump/Dispenser Automatic Test Fuel Point Setup for Ground Loop FuelingPage 76 MDE-4793A CFN Series Site Controller III

Strany 109

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 77Reader Entries and Fuel Point Pump/

Strany 110

Pump/Dispenser Automatic Test Master/Satellite Dispensers with Fuel PointPage 78 MDE-4793A CFN Series Site Controller

Strany 111 - 15 – Finish Start-up

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 79Start-up Commands13 – Start-up Comm

Strany 112 - IMPORTANT INFORMATION

Start-up Commands Sign-on and Preliminary StepsPage 80 MDE-4793A CFN Series Site Controller III Start-up Manual for CF

Strany 113 - Sample Form

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 81Sign-on and Preliminary Steps Start

Strany 114 - Sample FormSample Form

Start-up Commands Sign-on and Preliminary StepsPage 82 MDE-4793A CFN Series Site Controller III Start-up Manual for CF

Strany 115

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 83Sign-on and Preliminary Steps Start

Strany 116

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 3Abbreviations and Acronyms Starting

Strany 117

Start-up Commands Receipt Header, Broadcast MessagesPage 84 MDE-4793A CFN Series Site Controller III Start-up Manual f

Strany 118

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 85Load Fuel Products, Pumps, Tanks, P

Strany 119 - 1. SITE IDENTIFICATION

Start-up Commands Load Fuel Products, Pumps, Tanks, Prices, and TaxesPage 86 MDE-4793A CFN Series Site Controller III

Strany 120 - 4. COMMUNICATIONS

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 87Load Fuel Products, Pumps, Tanks, P

Strany 121 - 8. SYSTEM POWER

Start-up Commands Card LockoutPage 88 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.

Strany 122 - 13. PARTS USED

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 89Card Authorizations, Limitations St

Strany 123 - (include wiring distances)

Start-up Commands Card Authorizations, LimitationsPage 90 MDE-4793A CFN Series Site Controller III Start-up Manual for

Strany 124

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 91Load Merchandise/Departments, Price

Strany 125

Start-up Commands Enable DevicesPage 92 MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions

Strany 126

MDE-4793A CFN Series Site Controller III Start-up Manual for CFN III Versions 3.5 and above · November 2008 Page 93Cash Drawer, Shifts Start-up Comman

Komentáře k této Příručce

Žádné komentáře